Resources

Frequently asked questions

Answers to common questions about energy development, grid interconnection, digital infrastructure and energy trading.

Energy development

What does an energy developer do?

A developer takes a project from idea to operation: securing sites, studying the grid, obtaining permits and interconnection approval, arranging power sales and financing, and coordinating construction.

What makes a good site for solar, wind or storage?

Good resource (sun or wind), suitable land, manageable environmental constraints and, above all, nearby grid capacity at a reasonable connection cost.

I own land. Can I host an energy project?

Possibly. Contact us with the location and size of your land and we can give you an initial view of its suitability.

What is a Power Purchase Agreement (PPA)?

A long-term contract under which a buyer agrees to purchase electricity from a project at an agreed price. It is often central to financing a project.

How does curtailment affect project revenue?

Curtailment occurs when grid constraints prevent a project from delivering all the energy it could produce. Curtailment analysis estimates this lost output so it can be priced into decisions.

Grid interconnection

What is a point of interconnection (POI)?

The POI is where a project connects to the transmission or distribution grid. Its capacity and constraints strongly influence project size, cost and timing.

How does the AESO connection process work?

In Alberta, projects follow the AESO connection process, which moves through defined stages of study and regulatory filings, such as Need Identification Documents, before connection.

How does the IESO process work in Ontario?

In Ontario, projects are studied and assessed through the IESO's connection process, often in connection with competitive procurements. Well-prepared applications with accurate models move faster.

What are PSS/E and PSCAD studies?

PSS/E is used for steady-state, short-circuit and dynamic stability studies; PSCAD for detailed electromagnetic transient studies, particularly for inverter-based resources and HVDC.

What drives network upgrade costs?

How much new capacity the grid needs to accommodate a project: new or upgraded lines, transformers and protection equipment. They vary widely by location.

Digital infrastructure

Why is power the main constraint for data centres?

Data centres, and AI/HPC facilities in particular, need large, reliable blocks of power, and grid capacity in many regions is already committed. Where and when power can be delivered usually determines where capacity can be built.

What is a powered shell?

A building with confirmed power supply and core infrastructure in place, ready to be fitted out as a data centre.

What is powered land?

A site with confirmed or advancing utility capacity, or on-site generation, sufficient for data centre development.

What is behind-the-meter generation?

Generation located on or next to the site that supplies the load directly rather than through the utility grid. It can supplement or bridge utility supply.

Energy trading

Which products does Greenfinity trade?

Our activity focuses on crude oil, natural gas and petroleum products, with selected energy-related commodities considered case by case.

What is Greenfinity's role in a transaction?

Greenfinity sources opportunities and coordinates between qualified buyers, sellers and service providers. The role on each transaction is defined in the engagement.

What information do you need from a buyer or seller?

Company details, product and specification, quantity, delivery terms and timing. We may request corporate and compliance information before discussions progress.